Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.8205031

- Product Categories
- Friendly Links
Information Name: | 107TD47 |
Published: | 2012-02-07 |
Validity: | 150 |
Specifications: | 107TD47 |
Quantity: | 1.00 |
Price Description: | |
Detailed Product Description: | E-ISOM107 insulation monitor 107TD47 insulation Monitor - Health care IT system dedicated insulation monitoring device - Insulation monitoring, load monitoring and isolation transformer temperature monitoring - LCD display with backlight - Insulation monitoring the response value adjustment range 50kΩ-500Ω - Monitor the response of the overload adjustment range of 5A-50A - Alarm relay output - RS485 Interface - Analog current output measurement - Internal or external self-test button - Connection monitoring - Installation guide - Dimensions: 75x99x73mm ILT-107-V.4 IT system is a multifunction device, it is consistent with DIN VDE 0100T710-2002: 11 standard, which is used to monitor: * Single or multi-phase (maximum 3-phase) AC 230 V insulation resistance of IT systems · AC 24 V insulation resistance of IT systems (1-2 single-phase circuits operating room lighting) * Single or multi-phase transformer load current (up to 8 kVA) * Isolation transformer temperature (through PTC sensor) According to DIN VDE 0100T710-2002: 11 (Section 710.531.3.1 part) standard, all measured lines are in the monitoring of it. Built-in full-figure shows the operation and intuitive menu and simple, it offers all the detailed work and fault information. You can also edit all the menu parameters, these parameters are stored in a stable electronic erasable read-only memory. HRI-R22 insulation monitoring device by the seven LED display real-time visual status of the insulation. Very easy to set up the instrument on the panel have three miniature toggle switch, you can pre-set the need to monitor the insulation level. If you mistakenly select the switches, the device will automatically select the highest level of insulation to the police. If we set up 50KΩ such an insulation, then less than 50KΩ when the LED will glow in the test. Insulation monitoring device can also be tested with an external alarm panel PR2 linked. This panel can be fixed on the box, and can be installed three different ways. The panel is equipped with a mute button, built-in buzzer and the power supply, also has a power indicator and warning lights work. PR2 used for insulation testing and monitoring instrument insulation failure occurs to provide sound and light alarm. Each instrument can monitor up to four external PR2 for different regions. |
Admin>>>
You are the 12030 visitor
Copyright © GuangDong ICP No. 10089450, Set Power Technology Co., Ltd. Hangzhou All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 12030 visitor
Copyright © GuangDong ICP No. 10089450, Set Power Technology Co., Ltd. Hangzhou All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility